custom design Plastic road barriers injection mould

FOB Reference Price:Get Latest Price
US $5,000-50,000 / Set | 1 Set/Sets (Min. Order)
Supply Ability:
15 Set/Sets per Month
Port:
ningbo
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Zhejiang, China (Mainland)
Brand Name:
upmould
Packaging & Delivery
Packaging Details
covered with oil and pp sheet,put into standard wood case. Wood made according mould size.Mould spare parts shipped together with mould in wood case.Delivered from Ningbo port.We have our own shipping company,please inform us.
Delivery Time
15-60days
Product Description

 

NamePlastic Commodity Mould
mould steel45#,P20,2738,2344,2316,718,S136,H13 et
mould baseLKM,HASCO,DME or according to Customized's request
Mould Cavity No.single or Multiple cavity
Runner systemcold runner/hot runner
surface treatmentpolishing,texture or as per Customizeder request
design softwareCAD, PRO-E, UG etc.
design timewithin 3days
Plastic material

ABS,PP,PC ,PA6,PA66, TPU,POM ,PBT,PVC,HIPS,PMMA,
TPE,PC/ABS,TPV,TPO,TPR,EVA,HDPE.

mould production time15--60days, on basis of the difficulty level
mould life 500-1000 thousand times 

 

 Designed

According injection molding machine model

According sample raw material characteric

Specification

a. Material:45#,P20,2738,718H,2316,etc.according the customers’demands or customer required.

b. We use CAD,UG,PRO/E,Solid works,Catia to make drawing.

c. Standard mould base setted cooling system.

d. Great final polish.

e. Send samples to customers for inspection.

f. Customers’designs are welcome.

Equipment list

1. high speed milling center

2. Milling center

3. Numerical controlled EMD machine

4. High speed EDM machine.

5. Quick wire cutting machine.

6. Slow wire cutting machine.

7. Mirror EMD machine

8. comero

9. large grinding machine

10. precise grinding machine

Process

1. Quote competitive price according customer detail requirement

2. sign agreement

3. customer T/T deposit to us to start to design mould.

4. send mould drawing to customer for confirmation.

5. Mould design confirmed and start to make mould

6. Make mould trial during tooling time(which we get agreement with customer)

7. send mould trial sample to customer for inspection or customer come to our factory to inspect mould personally.

8. customer T/T balance to us after mould confirmed.

9. Deliver mould after get balance.

 

Contact Us

Other Products

Company Information

 

Packaging

 

Why Choose Us

 

FAQ